Every planning tool your factory has used covers sewing. Plani8 covers all five — cutting, embellishment, embroidery, washing, and sewing — in a single connected plan that auto-adjusts when anything changes on the floor.
It's not a planning gap. It's a planning assumption — that embellishment, cutting, embroidery and washing don't need a plan. They do. And every day they run without one, losses compound silently.
Plani8 models your full production picture — not just sewing — in under an hour.
Orders, styles, quantities imported. Plani8 maps each style to all 5 process requirements — machine time, unit availability, lead times — automatically. No manual translation required.
Machine capacity per process loaded against order requirements. Embellishment unit slots, cutting room ply limits, washing bath turns all visible alongside sewing line capacity in one view.
Plani8 identifies cross-process conflicts 24–72 hours in advance: 3 styles competing for the same embellishment unit, cutting delay creating a sewing gap, washing capacity shortage at week-end.
When Tracki8 signals a deviation from the floor, Plani8 recalculates downstream impact and pushes a replan recommendation — ranked by OTD impact — within 4 minutes.
Three focused capability groups, all connected to one live plan.
Representative signals and decisions planners act on every shift.
Style A2841 and C0930 both require Embellishment Unit #2 between 14:00–17:00 Friday. Plani8 detects a 3-hr overlap 18 hours in advance. Resequence option: move C0930 to Saturday morning — zero OTD impact.
Apply resequence →Cutting running 2.5 hrs behind plan. Sewing start at 09:00 Friday no longer achievable. Plani8 suggests: start Style D0444 sewing first, B1120 moves to Monday. Both OTD dates maintained.
Accept replan →6 styles require washing this week. Batch capacity: 4 styles per week. Plani8 identifies 2 styles for alternate wash slot or reschedule embellishment to create buffer. 3 options ranked by OTD impact.
Review options →Plan locked. ERP shipment date achievable. No constraints detected across all 5 processes — cutting, embellishment, embroidery, sewing, and washing all confirmed. Auto-closed.
View plan →One plan across all five processes. ERP-connected. Auto-replanning. Connected to FactoryOS. Live in 12 weeks.